Regulated asbestos removal for industrial facilities in northern Mexico.
ECOSAVE del Norte coordinates diagnosis, containment, controlled removal, transport and documented final disposition of asbestos-containing materials for plants and facilities operating in Monterrey, Nuevo León and the rest of northern Mexico. The scope, deliverables and timing are validated in writing per project; this page is technical orientation, not a blanket guarantee of regulatory outcome.
Procurement and EHS contact (documentation and scope): yrazu@ecosave.com.mx.
What industrial asbestos removal includes
Industrial asbestos removal in Mexico is a regulated process. The waste stream is treated as hazardous and requires authorized handlers, transport and final disposition. The scope below describes the typical execution sequence — actual deliverables are validated per site and contract.
Diagnosis and risk identification
Site walk to map asbestos-containing materials (ACM) — roof sheets, insulation, gaskets, friction materials — with photographic record.
Containment and controlled removal
Wetted removal under controlled conditions, isolation of affected areas and PPE per the agreed work plan.
Authorized transport
Hazardous material transport under SCT 15-I-328-23 — sealed packaging and labelling per the contracted scope.
Documented disposition
Final disposition coordinated with authorized facilities; manifests and disposition evidence delivered when the scope requires it.
Documentation delivered at closing
ECOSAVE del Norte structures every project so that procurement and EHS receive verifiable evidence of execution. Specific documents depend on the contracted scope, the asbestos stream, the destination facility and the regulatory framework applicable to each site.
Authorizations and verification
ECOSAVE del Norte references the following federal authorizations as a verifiable framework for the contracted scope. Vigency, applicable supuestos and operational coverage must be confirmed by the buyer in the official registries of each authority and in the formal proposal.
SEMARNAT — Collection authorization
15-II-155-23
Reference for collection and temporary storage of hazardous waste, including asbestos-containing materials, within the contracted scope.
SCT — Hazardous materials transport permit
15-I-328-23
Reference for specialized transport of hazardous materials across Mexican territory under federal regulation.
The references above describe authorizations of ECOSAVE del Norte and do not, by themselves, imply a favorable result before any inspection or audit. Each project remains subject to validated scope and applicable obligations of the generator.
Industrial buyers we serve
Industrial plants
Manufacturing, food, automotive and chemical operations with legacy asbestos in roofing or process equipment.
Commercial and corporate buildings
HVAC insulation, ducting and ceiling systems requiring controlled removal before retrofit or demolition.
Demolition and construction
Pre-demolition asbestos surveys and abatement coordinated with the general contractor's schedule.
When to engage an asbestos removal operator
- Pre-demolition or remodeling of industrial roofing, insulation or HVAC ducts in Monterrey or northern Mexico facilities.
- EHS audits requiring documented removal and final disposition of asbestos-containing materials.
- Multi-site programs with standardized documentation across plants, retail or hospitality assets.
- Procurement onboarding processes that require evidence of authorizations and operational capacity.
Frequently asked questions
Which authorizations cover industrial asbestos removal?
Asbestos waste in Mexico is handled as a hazardous waste stream. ECOSAVE del Norte references SEMARNAT 15-II-155-23 (collection authorization) and SCT 15-I-328-23 (hazardous materials transport permit). Buyers should verify vigency and applicable scope directly with each authority.
Do you cover Monterrey and the rest of northern Mexico?
Operational priority is Monterrey, Nuevo León and the regional industrial corridor of northern Mexico. Other plazas are evaluated per project, volume and access conditions.
What documentation is delivered at closing?
The package depends on the contracted scope. Typical deliverables include a work plan, transport manifests when movement is required, photographic record, technical report, and disposition evidence from authorized facilities when the stream requires it.
Can you coordinate with our EHS and procurement teams?
Yes. Scope, schedule, PPE and documentation are validated with EHS and procurement before mobilization, including DC3 evidence and other vendor onboarding documents when the buyer's checklist requires it.
Need a regulated asbestos removal plan for your facility?
ECOSAVE del Norte coordinates field execution and documentation with EHS and procurement teams. Initial orientation is typically within one business day, subject to information received and site validation.
All services are performed under applicable environmental regulations in Mexico for industrial operations. Scope, deliverables and timing are validated per project and contract.